# | Standard Interpretations |
---|---|
1 | - 1910.269(r)(7)(i) - Electric Power Generation, Transmission and Distribution Standard |
2 | - 1910.269(r)(1)(iv) - Compliance with electric power generation transmission and distribution requirements for testing of fiberglass insulating tools. |
3 | - 1910.269(r) - Clarification of 1910.269 as applied to line-clearance tree-trimming operations |